Posts by SarahPutt
-
Hard News: Locking in the Future, in reply to
At the very beginning (first draft proposal in 2009) it was specified P2P, but then about Sept 2009 they allowed PON. This enables Chorus to participate in the UFB using it's cabinetisation or Fibre to the Node roll out.